Sage Intacct Construction 2026 R4: 4 Updates That Cut Down on Side Spreadsheets
If you run construction accounting, you probably keep a few spreadsheets on the side. One tracks what a subcontractor billed versus what you approved. Another holds the detail behind your WIP number. The Sage Intacct 2026 R4 release brings more of that work into the system.
The release includes eight to ten construction updates. In our quarterly Practical Pro webinar, Solution Architect Dave Baxter picked the four that will help most. Dave is a CPA who spent two decades as a controller and CFO, including four years running Sage Intacct and Procore himself. He has been in your seat.
1. Subcontractor payment application workflow
You can now track the full life of a subcontractor pay app in Sage Intacct, from what the sub claims to what you actually pay.
Here’s how it works. Say you have a $500,000 framing subcontract with 10% retainage. The framer submits pay app #5 for $125,000, but the work isn’t quite that far along.
- Application: Record the $125,000 the sub claimed. It doesn’t post.
- Valuation: Record what you certify, $100,000. It doesn’t post either.
- Invoice: Only the $100,000 posts to AP, with retainage held.
Before, that $25,000 difference lived in a spreadsheet. Now each invoice’s history tab shows the application, valuation, and invoice, and you can click through to any of them. The result is a complete audit trail and fewer billing disputes.
Setup: Create three transaction definitions in Purchasing. In each, check “Enable payment application workflow” and choose Application, Valuation, or Invoice as the document category.
2. Flexible retainage posting
Retainage no longer has to land in one catch-all retainage payable account. You can split it across accounts, for example:
- Materials vs. subcontracts: Track retainage on materials separately from subcontractor retainage.
- Long-term retainage: For projects that run longer than a year, post to a long-term retainage account and skip the year-end reclassification.
Setup: In your purchasing transaction definitions, enable retainage and retainage transaction posting. Then map item GL groups to the retainage payable accounts you want. The item on each invoice line decides which account gets the retainage.
3. New fields on primary documents
Want to know how much of a subcontract has been billed, how much is left, and what’s been paid? You used to check several places. Now the subcontract’s primary document details show converted quantity and price, plus revised quantity, in one view. It’s a small change that saves a lot of clicking.
4. WIP management: cost detail levels
This was Dave’s favorite. In the past, WIP management gave you a roll-up number. If you wanted the detail behind it, you built a spreadsheet.
Now you can drill from the WIP number down to the line items behind it. Under Configure Projects, choose your level of detail:
- Summary (the old roll-up)
- Projects and subprojects
- Cost codes
- Cost codes and cost types
From the WIP schedule, open a project’s details to see PM forecast cost to complete, cost at completion, and percent complete by cost code. You can edit forecasts line by line and add a note explaining each change. A variance column shows where you’re over or under.
This helps when something affects specific lines, like buyout savings or tariffs. Finance teams get more transparency, and project managers get a place to explain their numbers.
And if you’ll sleep better with a spreadsheet saved somewhere, the WIP detail history report exports all of it to Excel.